1

The Penmann team finalises specialist HVAC installation for Nutricia’s production facility in Liverpool in line with FSI Phase 1 and 2

News Discuss 
Penmann successfully delivered a complex HVAC upgrade at Danone Nutricia's Liverpool-based production site, supplying a fully engineered ventilation and climate control system engineered to meet strict hygiene and production standards. The project encompassed the complete lifecycle delivery of cutting-edge HVAC systems across non-production, Medium Care (MC) and High Care (HC) https://mediasocially.com/story5597722/the-penmann-team-finalises-specialist-hvac-installation-for-nutricia-s-production-facility-in-liverpool-in-line-with-fsi-phase-1-and-2

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story